New Security Combination Management Tagout Lockout Station with Safety Lockset
Part No.: LS03
10-Lock Lockout Station
Part No. | Description |
LS01 | 406mm(W)×315mm(H)×65mm(D) |
LS02 | 558mm(W)×393mm(H)×65mm(D) |
LS03 | 558mm(W)×393mm(H)×65mm(D) |
Group isolation requirements - handover process
Responsibilities of isolation leader:
The formal handover will include:
Barrier of isolation
Review of the isolation steps of the program
Communicate changes
The leader of the isolation team who took over signed the handover form
Group isolation requirements - disuse
Responsibilities of isolation leader:
Make sure everything is done
Make sure there are no personal locks or device locks on the isolation board
Remove the group lock and isolation procedure from the isolation panel
Identifies the isolation board in the unenabled state or as unenabled
Organize isolation personnel to conduct equipment isolation
Group gree requirements - enables isolation and connection isolation multiple times
Using the same isolation procedure, the group isolation is lifted and restarted
To allow testing and positioning of equipment
Risk assessment must be performed
Primary isolation was performed
Isolation needs to be partially removed - after all personal locks have been removed
Equipment tested
If necessary, the device is isolated again
Emergency response
Responsibilities of isolation leader/isolator:
Use your own personal locks or single point of isolation on the isolation board to protect emergency personnel (when they need access to the quarantined area)
Coordinate isolation/isolation requirements as required
Assist in isolating influencers as required