Home > products >
Safety Lockout Station
>
Combination Management Tagout Safety Lockout Station With Safety Lockset

Combination Management Tagout Safety Lockout Station With Safety Lockset

Product Details:
Place of Origin: China
Brand Name: Lockey
Certification: CE, ISO9001, OHSAS18001, CE
Model Number: LS03
Detail Information
Place of Origin:
China
Brand Name:
Lockey
Certification:
CE, ISO9001, OHSAS18001, CE
Model Number:
LS03
Material:
PC Cover And ABS Body
Size:
558mm(W)×393mm(H)×65mm(D)
Color:
Normally Yellow, Other Colors Can Be Customized
Application:
To Accommodate Padlocks, Hasps, Tags, Etc.
Highlight:

High Light

Highlight:

lockout tagout storage cabinets

,

brady lockout station

Trading Information
Minimum Order Quantity:
5
Price:
negotiable
Packaging Details:
1pc/box, 10pcs/ctn
Delivery Time:
1-7 days
Payment Terms:
Western Union, L/C, T/T, credit card, paypal
Supply Ability:
5000 pcs monthly
Product Description

New Security Combination Management Tagout Lockout Station with Safety Lockset

Part No.: LS03

10-Lock Lockout Station

  • Made from engineering plastic PC.
  • It’s one piece design, with a cover to lock out. Can accommodate padlocks, hasps, lockout tags etc.
  • There’s a lockable combination padlock hole for locking out to limit access to authorized employees.

 

Part No. Description
LS01 406mm(W)×315mm(H)×65mm(D)
LS02 558mm(W)×393mm(H)×65mm(D)
LS03 558mm(W)×393mm(H)×65mm(D)

Combination Management Tagout Safety Lockout Station With Safety Lockset 0Combination Management Tagout Safety Lockout Station With Safety Lockset 1Combination Management Tagout Safety Lockout Station With Safety Lockset 2Combination Management Tagout Safety Lockout Station With Safety Lockset 3Combination Management Tagout Safety Lockout Station With Safety Lockset 4

Group isolation requirements - handover process

Responsibilities of isolation leader:

The formal handover will include:

Barrier of isolation

Review of the isolation steps of the program

Communicate changes

The leader of the isolation team who took over signed the handover form

Group isolation requirements - disuse

Responsibilities of isolation leader:

Make sure everything is done

Make sure there are no personal locks or device locks on the isolation board

Remove the group lock and isolation procedure from the isolation panel

Identifies the isolation board in the unenabled state or as unenabled

Organize isolation personnel to conduct equipment isolation

Group gree requirements - enables isolation and connection isolation multiple times

Using the same isolation procedure, the group isolation is lifted and restarted

To allow testing and positioning of equipment

Risk assessment must be performed

Primary isolation was performed

Isolation needs to be partially removed - after all personal locks have been removed

Equipment tested

If necessary, the device is isolated again

Emergency response

Responsibilities of isolation leader/isolator:

Use your own personal locks or single point of isolation on the isolation board to protect emergency personnel (when they need access to the quarantined area)

Coordinate isolation/isolation requirements as required

Assist in isolating influencers as required