Check the electric
Maintenance work: responsible person - authorized operator
Avoid restarting the energy switch before work;
Do not bypass the current Lockout tagout device when installing new piping and circuits
Release locks and tags and permit closure: responsible persons - licensed operators, related operators, others
Upon completion of the work, the lockdown and delisting shall be carried out after checking the working area free of tools, raw materials and personnel;
The work permit shall be closed after obtaining the signature of the relevant personnel.
Energy isolation priorities
Preferential isolation selection of electrical energy, chemical energy, mechanical energy, thermal energy, potential energy, etc
Lock - tag - test isolation
Guarantee of isolation effect
Communication tips
Effectiveness of isolation at work to prevent isolation from being accidentally broken.
Locked equipment
Switchboard, pump, compressor, pipeline, refrigerating equipment, heating and ventilation system, pipeline system, instrument equipment
Failure to observe the Lockout tagout caused the fatal accident
Not stopping the machine or equipment
No energy is really cut off
It doesn't eliminate the residual energy
Accidentally turn on a device that has been turned off
The work site is not actually cleaned up before restarting
Test confirmation procedure
The power supply test
Test points to note:
1. Territorial unilateral test, maintenance unit status test;
2. Start the operation of the equipment temporarily, and re-test before resuming the maintenance operation.