Lockey Safety Products Co.,Ltd

Lockout is a choice you make, 

Safety is the destination Lockey achieve. 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Company News
Home ProductsSafety Lockout Hasp

High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel

High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel

  • High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel
  • High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel
High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel
Product Details:
Place of Origin: China
Brand Name: Lockey
Certification: CE, ISO9001, OHSAS18001, CE
Model Number: BAH02
Payment & Shipping Terms:
Minimum Order Quantity: 200
Price: negotiable
Packaging Details: 1pc/box, 10pcs/middle box, 200pcs/ctn
Delivery Time: 1-7 days
Payment Terms: Western Union, L/C, T/T, credit card, paypal
Supply Ability: 100000 pcs monthly
Contact Now
Detailed Product Description
Material: Hardened Stee Body: Rust Proof
Overall Size: 40mm×176mm Product Name: Butterfly Lockout Hasp
Suitable For: Allow Multiple Padlocks To Be Used Shackle Size: 86mm Vertical Clearance.
High Light:

lockout tagout hasp

,

master lock locking hasp

 

OEM Best Price High Strength Butterfly Heavy Duty Steel Safety Lockout Hasp

Part No.: BAH02

Butterfly Lockout Hasp

  • Made from hardened steel, rust proof.
  • Allow multiple padlocks to be used when isolating one energy source
  • Shackle size: 86mm vertical clearance.

 

Part NO. Description
BAH02 Overall size:40mm×176mm

High Strength Butterfly Master Lock Lockout Hasp Made Heavy Duty Steel 0

Chemical plant energy isolation program 1

Chemical Energy isolation plan (Energy IsolationPlan, EIP) is accused of manufacturing all hazardous Energy sources, such as maintenance area to prevent the production operation, construction, maintenance, maintenance of machinery or equipment or project transformation occurs during may cause personal injury or occupational disease accidental transmission, start, or a sudden release of Energy the Energy leakage, such as fire or explosion accidents.

Usually, the energy sources in chemical plants are electrical energy, chemical energy, dynamic energy, radiant energy, gas energy, thermal energy, hydraulic energy, potential energy and so on.

For each specific process pipeline, equipment or instrument overhaul or renovation work, develop a reasonable and complete energy isolation plan, can effectively control the potential dangerous energy source accidental release, protect personnel and company equipment property safety.

To make a good energy isolation plan, we must start from three stages: preparation, planning and implementation.

The run-up

At this stage, the administrative staff of the chemical process production plant shall prepare the energy isolation plan according to the maintenance or project operation content and scope. Personnel in the administrative area must pass the training and examination of energy isolation planning procedures, and be familiar with the process flow, production operation points and other energy sources in the process piping equipment.

Area personnel to isolate the equipment, pipelines or instruments to prepare cleaning plans, cleaning processing. According to the characteristics, temperature, pressure and harmfulness of the residual materials and chemicals in the process equipment, the cleaning plan must describe and regulate in detail the safe transfer, empelling and drainage of the residual materials and the cleaning plan.

The cleaning plan must be a detailed standard operating procedure, including the specific procedures, safety protection requirements and post-cleaning inspection methods and standards when cleaning process equipment and pipeline residual materials on site.

If the process medium of process equipment and pipelines is inflammable, explosive, toxic and harmful chemicals, the cleaned process equipment and pipelines need to measure the minimum explosive limit and toxicity of residues through the LEL(Lower Limited LEL) detector and PID VOC detector to ensure safe operation.

Of course, the final clean-up plan must be fully discussed by district operators and approved by district supervisors before implementation and implementation.

The implementation of a complete and reasonable cleaning plan is a key factor for the effective cleaning of the residual energy in the process equipment and pipelines in the operation area, which can thoroughly or to the greatest extent clean up the residual process materials and chemicals, and ensure the safety of the overhaul operation area.

Contact Details
Lockey Safety Products Co.,Ltd

Contact Person: claire

Send your inquiry directly to us
Other Products