Lockey Safety Products Co.,Ltd

Lockout is a choice you make, 

Safety is the destination Lockey achieve. 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Company News
Home ProductsMaintenance Lockout Kit

Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color

Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color

    • Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color
    • Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color
  • Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color

    Product Details:

    Place of Origin: China
    Brand Name: Lockey
    Certification: CE, ISO9001, OHSAS18001, CE
    Model Number: LG41

    Payment & Shipping Terms:

    Minimum Order Quantity: 5
    Price: negotiable
    Packaging Details: 1set/box
    Delivery Time: 1-7 days
    Payment Terms: Western Union, L/C, T/T, credit card, paypal
    Supply Ability: 10000 pcs monthly
    Contact Now
    Detailed Product Description
    Certification: ISO9001, CE, OSHA ,ATEX Bag Material: Waterproof Nylon Fabric
    Name: Electrical Lockout Kit Feature: Durable, Light Weight
    Color: Red Warranty: 1 Year
    High Light:

    brady lockout tagout kits

    ,

    lock out tag out kits for electrical

     

    Industrial Electrical Safety Lockout Tagout Loto Personal Portable Lockout Kit

     

    Part No.: LG41

    Electrical Lockout Kit

    • Made from durable waterproof nylon fabric.
    • Light-weight and easy to carry or wear .
    • Carrying all proper secure safety lockout equipment with small size.

    Including:

    • Lockout bag (LB41) 1PC;
    • Safety padlock (P38S-RED) 1PC;
    • Safety padlock (PC175-RED) 1PC;
    • Lockout tag (LT03) 12PCS;
    • Breaker lockout (CBL32) 2PCS;
    • Breaker lockout (CBL31) 1PC;
    • Lockout hasp (SH01) 1PC;

    Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color 0Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color 1Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color 2Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color 3Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color 4

    Isolation preparation - specify "device isolation plan"

    Identify hazards associated with the equipment to be isolated

    Identify the isolation points on the flow meter diagram

    Determine how to shut down and decompress equipment

    Isolation preparation - energy isolation sheet

    Record all isolation points on the energy isolation sheet

    The energy isolation sheet shall be kept at the work site together with the work permit.

    Isolation preparation - general requirements (according to operating procedures)

    All personnel working in isolation must know

    The equipment was shut down

    The proper place to isolate

    Isolate all power sources of a device

    Clam preparation - general requirements (according to operating procedure)

    Safely empty toxic or flammable liquids and gases

    Flammable liquid discharge to the same potential to zero leakage storage area to prevent electrostatic fire

    At the first flange nearest to the device to be opened, isolate the processing device

    In the process of emptying or relieving the pressure of the process processing equipment, the adjacent area cannot carry out the thermal work.

    3.14 The Accident

    3.14 the accident

    Accident history:

    In March 2012, the raw material section of the cement plant was shut down for maintenance. One operator enters the tee at the bottom of the long belt to clean the lumped material, and the next person monitors it. Suddenly the long belt opens and the material falls from above the operator, hitting the operator. On the side of the guardian immediately contact the central control personnel stop, the operator rescued. No injuries were reported.

     

    Cause of accident:

    1. During shutdown, the long belt is not power off and not listed.

    2. When the central control personnel started up, they failed to check the situation with the on-site personnel.

    3. The guardian fails to fulfill the responsibility of safety guardianship. When the belt was opened, it was not detected and stopped in time.

    Enlightenment and corrective measures:

    1. When all equipment is stopped for maintenance, power must be cut off and listed.

    2. During shutdown, the central control shall communicate and coordinate with field personnel to open any equipment, and confirm that the equipment to be opened is unmanned.

    3. The safety supervision personnel shall take charge of the supervision and keep in touch with the maintenance personnel and the central control personnel in time.

     

    Contact Details
    Lockey Safety Products Co.,Ltd

    Contact Person: claire

    Send your inquiry directly to us
    Other Products