Lockey Safety Products Co.,Ltd

Lockout is a choice you make, 

Safety is the destination Lockey achieve. 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Company News
Home ProductsCircuit Breaker Lockout Device

Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

    • Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools
    • Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools
  • Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

    Product Details:

    Place of Origin: China
    Brand Name: Lockey
    Certification: CE, ISO9001, OHSAS18001, CE
    Model Number: COMBO CBL-1

    Payment & Shipping Terms:

    Minimum Order Quantity: 200
    Price: negotiable
    Packaging Details: 1pc/box, 10pcs/middle box, 200pcs/ctn
    Delivery Time: 1-7 days
    Payment Terms: Western Union, L/C, T/T, credit card, paypal
    Supply Ability: 100000 pcs monthly
    Contact Now
    Detailed Product Description
    Material: Nylon PA Install: Need Tools
    Color: Red Product Name: Moulded Case Circuit Breaker Lockout
    Suitable For: Lock Out Different Types Of Circuit Breakers Size: 45mm×25mm×10mm

    Factory Sale Insulated Mcb Electrical Combined Circuit Breaker Lockout Set

    Part No.: COCBL1

    Combined circuit breaker lockout set

    a) Made from engineering plastic strengthened nylon PA

    b) Each set includes 5 shapes of lockout to lock different types of circuit breakers.

     

    Part no. description
    COCBL1

    CBL01-1*1

    CBL02-1*1

    CBL03-1*1

    CBL04-1*1

    CBL05-1*1

     

    Need a small screw driver to install
    COCBL2

    CBL01-2*1

    CBL02-2*1

    CBL03-2*1

    CBL04-2*1

    CBL05-2*1

     

    Without installing tools needed.

     

    Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

    Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need ToolsInsulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

     

     

    Insulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need ToolsInsulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need ToolsInsulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need ToolsInsulated MCB Electrical Combined Circuit Breaker Lockout Set Install Need Tools

    Case 1: an arc burn accident

    On November 4, 2000, a maintenance worker at a fertilizer plant in anhui province was burned by an electric arc.

    Scene: on the morning of November 4, the ammonia pump room no. 1 carbonized pump in the phosphating section hit and burned out. In accordance with the arrangement of the section chief, the section maintenance worker shall notify the electrician on duty to cut off the power supply, remove the wire, and lift the motor down to the base to click the maintenance team for emergency repair. At 1630 hours, the motor was repaired and returned to the pump room. Maintenance group leader Lin to find a hammer, wrench, pad iron, ready to smooth the foundation, put click. When he was about to squat down to work in front of the foundation, he was knocked down by a arc of light, and his partner quickly dragged him out of the scene and sent him to the hospital for treatment. The accident caused arc burns to Lin's left arm and left thigh.

    Cause of accident:

    1. The main reason for the accident is that the stitches are not completely removed when the electrician cuts off the electricity. Electrician after power failure did not strictly follow the operating procedures, the fuse out, the end of the wire bandaging, and sign warning.

    2. When the on-duty operator of the carbonization section opened the carbonization pump, he pushed the switch button by mistake, making the end of the line electrified, which was the inducing factor of the accident.

    3. The management of the electrical workshop is chaotic, and the lack of inspection on the implementation of rules for the electrical workers makes the electrical work not standardized, which almost leads to the disaster, which is the indirect cause of the accident

    4. Individual electrician professional quality is not high.

    Preventive measures:

    1. Report the opinions on the handling of the accident to the whole factory, initiate the technical training activities of learning rules, understanding rules and strictly implementing rules, improve the professional quality of employees, and create conditions for preventing similar accidents.

    2. The safety department of the chemical fertilizer plant shall strengthen the inspection, and impose a fine of 50-100 yuan upon the violation of rules and regulations caused by incomplete interruption of electric work and non-listing, and shall study in the safety department of the plant for 1 week.

    3. It is suggested that the vocational education department of the factory should pay attention to the "charging" problem of maintenance workers in the staff education, so as to strengthen their self-protection ability.

     

    Contact Details
    Lockey Safety Products Co.,Ltd

    Contact Person: claire

    Send your inquiry directly to us (0 / 3000)

    Other Products